NFPA 13 Compliant◆Fully Licensed & Insured◆Red Seal Licensed Fitters◆Local 853 Union Member◆500+ Installations◆Ontario-Wide Service◆Residential Commercial Industrial◆24/7 Emergency Response◆West Hamilton Builder Association◆Design Supply Install◆NFPA 13 Compliant◆Fully Licensed & Insured◆Red Seal Licensed Fitters◆Local 853 Union Member◆500+ Installations◆Ontario-Wide Service◆Residential Commercial Industrial◆24/7 Emergency Response◆West Hamilton Builder Association◆Design Supply Install◆

500+

Installations

100%

Owner-Operated

12

Industries

100%

Code Compliant

Featured Case Study · Residential

The Jackson
Condominiums

Complete fire protection package for a multi-storey residential development. Wet-pipe sprinkler system, electric fire pump, and full parking-level coverage. Engineered, installed, and commissioned to NFPA 13.

Location

Ontario

Sector

Residential

System

Wet Pipe · Fire Pump

Standard

NFPA 13

Fire pump close-up, The Jackson Condos

Pump Room · Electric Fire Pump

Complete pump assembly with control panel, jockey pump, and pressure monitoring.

Fire pump and valve room, The Jackson Condos

Valve Room

Riser, backflow preventer, and control valves.

Overhead sprinkler mains, The Jackson Condos

Sprinkler Mains

Overhead grooved-steel mains with seismic bracing.

Underground parking level fire protection, The Jackson Condos

Parking Level

Full underground parking protection.

Building exterior, The Jackson Condos

Building Exterior

Multi-storey residential development.

Case Study · Residential

Exchange District
Condominiums

Fire protection package for a multi-tower high-rise residential development. Wet-pipe sprinkler system, standpipe risers, and a full-capacity electric fire pump. Installed and commissioned to NFPA code across multiple connected towers.

Location

Ontario

Sector

Residential

System

Wet Pipe · Standpipe · Fire Pump

Standard

NFPA 13 · NFPA 14

Fire pump assembly, Exchange District Condominiums

Pump Room · Electric Fire Pump

High-capacity fire pump assembly serving standpipe and sprinkler systems across the tower.

Riser and valve assembly bank, Exchange District Condominiums

Valve Room

Bank of floor-control risers with backflow assemblies.

Standpipe and sprinkler mains in parking garage, Exchange District Condominiums

Parking Level

Standpipe and sprinkler mains through the parkade.

Fire pump room riser assembly, Exchange District Condominiums

Riser Assembly

Pump room piping, gauges, and control valves.

Building exterior, Exchange District Condominiums

Building Exterior

Multi-tower high-rise residential development.

Case Study · Residential

The Albright
Rentals

Complete fire protection package for a multi-storey residential rental development. Wet-pipe sprinkler system, standpipe/F.D.C. connection, and full parking-level coverage. Installed and commissioned to NFPA 13.

Location

Ontario

Sector

Residential

System

Wet Pipe · Standpipe

Standard

NFPA 13

Backflow and valve assembly, The Albright Rentals

Riser Room · Backflow Assembly

Backflow preventer and control valve assembly, tagged and ready for inspection.

Overhead sprinkler mains in parking garage, The Albright Rentals

Parking Level

Exposed overhead mains through the parking garage.

Fire department connection, The Albright Rentals

F.D.C. Connection

Sprinkler/standpipe FDC, tagged and commissioned.

Finished lobby with sprinkler coverage, The Albright Rentals

Building Interior

Sprinkler and alarm coverage through finished common areas.

Building exterior, The Albright Rentals

Building Exterior

Multi-storey residential rental development.

Case Study · Commercial

APT
Auto Parts

Fire protection for a commercial distribution warehouse. ESFR sprinkler system with in-rack protection through high-piled storage, plus overhead mains and control valves. Installed and commissioned to NFPA 13.

Location

Ontario

Sector

Commercial

System

ESFR · In-Rack

Standard

NFPA 13

In-rack ESFR sprinkler heads through high-bay storage racking, APT Auto Parts

High-Bay Racking · ESFR Protection

In-rack sprinkler heads through multi-level high-piled storage.

Overhead sprinkler mains and control valves, APT Auto Parts

Overhead Mains

Mains, control valves, and gauges at the roof line.

In-rack sprinkler branch lines through high-bay storage, APT Auto Parts

In-Rack Branch Lines

Branch lines running through the high-bay racking.

ESFR sprinkler coverage through loaded storage racking, APT Auto Parts

Storage Coverage

Full-height coverage through loaded high-piled storage.

Overhead sprinkler drops through open ceiling, APT Auto Parts

Ceiling Coverage

Overhead drops coordinated with ductwork and structure.

Building exterior, APT Auto Parts

Building Exterior

Commercial distribution warehouse.

Additional Projects

500+ installations. More case studies coming.

Full project references available on request. Contact Brett directly for a walk-through of relevant jobs for your building type.

Ready to be
on this list?

Start Your Project →